A large central heating plant in southern Ontario required a relay-based burner management system to be replaced on 8 dual burner industrial steam boilers firing natural gas and #2 oil. A hot swappable fuel switch was designed into the system so the boiler could remain in operation while switching fuels.
Due to the complexity of the project and the client's production requirements, the burner management conversion was completed in three phases over three summers.
Subsequently we modernized the plant's old pneumatic boiler controls by installing a new distributed control system.
For more details on this project or to find out how we can design and engineer a custom conversion solution for your business, please contact Bacon Engineering today.